EU to blame over Nord Stream 1 lying idle – Russia

Russian Deputy Prime Minister Alexander Novak says the EU violated repair and shipping contracts relating to Nord Stream 1 equipment Read Full Article at RT.com

EU to blame over Nord Stream 1 lying idle – Russia

The gas pipeline was shut because contracts for shipping and repair were violated by Brussels, Moscow has claimed

Russian Deputy Prime Minister Alexander Novak has blamed the European Union for the problems that have prevented the resumption of gas supplies via the Nord Stream 1 pipeline. He told the EU “not to lay the bloc’s leaders’ fault at Russia’s door.”

“Right now, the entire problem lies precisely on that side, because all the conditions of the repair contract have been completely violated, along with the terms of shipping of the equipment,” Novak said on Sunday in an interview with Rossiya 1 TV channel.

Gas deliveries via Nord Stream 1 were shut down completely on August 31. Prior to that, the pipeline under the Baltic Sea had been operating at 40% capacity since June, providing just 67 million cubic meters per day. The initial reduction in supply was due to a delay returning gas turbines following scheduled maintenance in Canada, which arose as a result of Ottawa’s sanctions on Russia.

READ MORE: Russia is an unreliable energy partner – Germany

In July, supplies through the pipeline dropped to 20% capacity, as the remaining turbines required an overhaul. 

On Friday, Gazprom said shipments would not be resuming following a three-day maintenance break after an engine oil leak was detected in a turbine. The company provided no details on the duration of the stoppage.

Find more stories on economy and finance in TROIB business